Data center sites and grid rights:
connecting sellers with buyers.
Grid connection outlook is checked by application specialists.
DC Setten connects those who want to sell or lease data center sites and grid rights (projects with secured receiving capacity) with those who want to buy or lease them. Land originally acquired for battery storage or solar projects, and projects stalled by connection costs or lead times, can be reassessed as data center sites. Grid Work Inc. handles everything from the preliminary study to the contract application, up to extra-high and ultra-high voltage.
Consultation, registration, and desk review are free of charge. Sale and lease contracts are concluded directly between the parties or through a licensed real estate broker.
- Grid connection applications supported
- 1,000+
- Of which, data center power applications
- approx. 150
- Transmission and distribution utilities covered
- All 10 in Japan
- Receiving voltage covered
- 6.6kV〜275kV
Figures are cumulative projects supported by Grid Work and its group company (Virtual Work Inc.); one receiving point counts as one project, low voltage included. As of September 2026.
For those who want to sell or buy data center sites and grid rights
DC Setten is a matching desk. We keep the criteria of those who want to sell or lease data center sites and grid rights, and of those who want to buy or lease them, and when the criteria match we connect both sides with their consent. Before making a connection, specialists in utility applications check how much power the site can receive and by when.
Typical inquiries
- The grid connection study came back with costs or lead times that did not work
- We want to sell or lease land acquired for battery storage or solar as a data center site
- We want to transfer a project with secured receiving capacity (grid rights)
- We have idle land near a substation or transmission line
What we do
- Check distance and voltage class of the nearest substation and transmission line
- Check the outlook for receivable capacity and timing
- Contact you when a buyer with matching criteria appears
What to prepare
- Location of the land (to municipality level)
- Approximate area
- Grid connection study response (if available)
Typical inquiries
- We want to acquire data center sites or projects with a realistic power outlook
- We want to register preferred area, capacity, and timing
- We want utility consultation and applications handled after acquisition
What we do
- Register your criteria (not disclosed to third parties without your consent)
- Contact you when matching land or projects come in
- Check the power outlook for the site (voltage class, indicative lead time)
- Handle the preliminary study application and the contract application
What to prepare
- Preferred area
- Receiving capacity and target timing
- Form of acquisition (purchase, lease, joint venture, etc.)
Intended for trading companies, developers, data center operators, and investors.
Register your criteriaTypical inquiries
- We want to confirm in advance whether a candidate site can receive power
- We want to compare several candidate sites in terms of power
- We want utility consultation and applications handled for us
What we check
- Power outlook for each candidate site (voltage class, indicative lead time)
- How to proceed with the utility's preliminary study
- Documents required for the preliminary study and the contract application
What to prepare
- Location of the candidate site (to municipality level)
- Receiving capacity and target timing
- Status of discussions with the utility (if any)
We connect parties whose criteria match, check the power outlook, and handle utility applications. We do not negotiate prices or terms or handle contract procedures for sales or leases; these are carried out directly between the parties or through a licensed real estate broker.
Scope
| Receiving voltage | High voltage (6.6 kV), extra-high voltage (22–77 kV), ultra-high voltage (154 kV, 275 kV) |
|---|---|
| Area | All of Japan (10 general transmission and distribution utilities) |
| Subject | Data center sites (land) and grid rights (projects with capacity secured through a preliminary study or connection study response, or a contract application) |
| What we do | Registering sellers' and buyers' criteria, contacting matching counterparties, checking the power outlook, applying for the utility's preliminary study, handling the contract application, and schedule coordination up to power-on |
| What we do not do | Negotiation of prices or terms and contract procedures for sales or leases (we are not a licensed real estate broker), design and construction, equipment sales |
| After your inquiry | We review the details and get back to you. Contact depends on a matching counterparty appearing, and a connection is not guaranteed. Whether power can be received, lead times, and cost contributions are determined by the utility's study. |
How it works
| 1. Inquiry / registration | Use the form to tell us the location of the land or project you want to sell, or the criteria for what you want to buy. No attachments needed. |
|---|---|
| 2. Desk review | We check the nearest substation, transmission line, and voltage class, and share the power outlook (free of charge). |
| 3. Connection | When criteria match, we contact both sides with their consent. Company names and locations are not disclosed to the counterparty without consent. |
| 4. Consultation and application | On request, we apply for the utility's preliminary study and handle the contract application. |
Procedure stages
| Data centers (demand side) | Preliminary study → Contract application → Supply approval |
|---|---|
| Battery storage and solar (generation side) | Pre-consultation → Connection study → Contract application → Interconnection approval |
In the form, you can select how far the procedure has progressed.
Our specialist
The head of our application work spent more than 10 years at an electric utility in substation design, construction, and management, and holds professional qualifications. Candidate sites and application documents are reviewed from the viewpoint of the side that accepts the connection.
FAQ
- What is DC Setten?
- A matching desk that connects those who want to sell data center sites and grid rights with those who want to buy them. It is operated by Grid Work Inc., a grid connection application agency, which handles everything from checking the power outlook to applying to the utility.
- Can land acquired for battery storage or solar be used as a data center site?
- In some cases, yes. Power plants and storage export electricity while data centers import it, so the utility's study differs. Land where costs or lead times did not work for generation may be assessed differently for load, so we check the outlook from the nearest substation, transmission line, and voltage class.
- What is needed to sell or lease a data center site?
- The location (to municipality level) and approximate area are enough to start. If you have a grid connection study response, we will review it.
- How do I buy data center sites or grid rights?
- Select 'Buyers of sites and projects' in the form and register your preferred area, capacity, timing, and form of acquisition. We contact you when matching land or projects come in.
- What conditions does a data center site need?
- Being able to receive the required power is the premise. Depending on capacity, power is received at extra-high voltage (22–77 kV) or ultra-high voltage (154 kV, 275 kV), and distance to substations and lines, lead time, and cost contributions drive feasibility. We check this power side.
- What are grid rights?
- On this page, the term means projects that have secured capacity from the utility through a preliminary study or connection study response, or a contract application. Whether the holder can be changed or succeeded depends on the utility's procedures.
- Is DC Setten a real estate company?
- No. Grid Work Inc. is a grid connection application agency, not a licensed real estate broker. Negotiation of prices or terms and contract procedures for sales or leases are carried out directly between the parties or through a licensed real estate broker.
- Is there a fee for consultation or registration?
- Consultation, registration, and desk review are free. If you ask us to handle utility applications, we provide a quote based on the scope.
Company
| Company name | Grid Work Inc. |
|---|---|
| Business | Grid connection application agency (power plants, battery storage, data centers) |
| Address | Osaka Ekimae Dai-2 Building, 1-2-2 Umeda, Kita-ku, Osaka, Japan |
| Phone | +81-6-6586-9716 (weekdays 9:00–18:00 JST) |
Inquiry and registration form
Selecting an inquiry type switches the input fields. No attachments needed. We will ask for details when we contact you.