Documents and drawings
Application forms, single-line diagrams, layout drawings and more, in each utility's required format.
Grid Connection Application Services
From low voltage to extra-high voltage, we handle applications to every utility in Japan. A team that knows how utilities actually work prepares the documents and drawings, deals with the utility, handles revisions and inquiries, and tracks progress.
Grid interconnection applications, transcription, forms, reports. Operating power plants and grid-scale battery storage involves a great deal of administrative work that requires specialist knowledge.
| Target | Low voltage | High voltage | Extra-high voltage |
|---|---|---|---|
| Power plants (solar)POWER PLANT | ✓ | ✓ | ✓ |
| Battery storage (grid-scale BESS)BATTERY STORAGE | ✓ | ✓ | ✓ |
| Data centers (power supply)DATA CENTER | — | ✓ | ✓ |
Low voltage: under 50 kW / High voltage: 50 kW to under 2,000 kW / Extra-high voltage: 2,000 kW and above. Other power plants (wind, biomass, fuel cells) on request. ※ Attached drawings are prepared for the application based on your design documents. Administrative filings such as FIT/FIP project certification are handled with partner administrative scriveners.
Application forms, single-line diagrams, layout drawings and more, in each utility's required format.
Submission, consultation and progress checks, handled by people who know the utility side of the process.
We respond to rejections and requests for additional material, resubmit corrected documents, and report progress and deadlines site by site.
How we work: see here. Consultation and document review only: see here. DX and AI consulting is provided by our group company Virtual Work Inc. (contact form, Japanese).
* Includes work performed by our Representative Director during his tenure at a utility and support provided by our group company.
We present, anonymously, case studies of applications to electric utilities that we have handled on behalf of clients. Our data center application cases number more than 200 (the total of preliminary studies, preliminary consultations, and formal applications).



Related articles: What Is Data Center Application Support? / All Insights articles