Case Study

O&M Provider C: Automating Remote Monitoring Aggregation and Daily Report Notifications

An operational improvement case based on the "MiraMoni" approach, integrating aggregation, anomaly detection, and notifications across multiple monitoring systems. We redesigned the workflow so that data collection on the remote monitoring side and daily / monthly reporting are handled in a single flow.

DX / AI ConsultingSolar O&M

Project Overview

The client was running several different remote monitoring systems side by side, and aggregating daily generation results and checking for anomalies took a great deal of time. We switched to an operation in which the previous day's data is aggregated automatically overnight and delivered to the responsible staff before the start of the working day. As publicly available information also indicates, early detection of anomalies and prioritization of inspections in monitoring operations have a direct impact on revenue, so we defined responsiveness in daily operations as the top requirement.

Solution Design

Anomalies are identified by combining warning information shown on the system screens with the degree of underperformance relative to the average of the plant group. Each notification includes per-inverter trend charts and log screenshots so that a decision on whether to dispatch a site visit can be made immediately. In addition, the reason for each anomaly is output under categories such as "Output Drop," "Communication Loss," and "Missing Measurement," and notifications were standardized on a template that leaves staff in no doubt about the initial response.

Changes After Implementation

Human work is now concentrated on "reviewing the distributed report" and "issuing on-site inspection instructions." Dependence on specific individuals in monitoring work has eased, and the cost of handover when staff change has dropped substantially. On a monthly basis, not only the time spent preparing reports but also the time spent preparing explanations of anomaly cases has been compressed, achieving both quality and speed in management reviews.

Reference: Proposal for "MiraMoni," an aggregation automation service for remote monitoring of commercial solar plants (PDF, Japanese)

All Case Studies