Grid Connection Application Services
We handle grid connection applications to Japanese utilities for power plants, battery storage and data centers. Low voltage to extra-high voltage, all 10 general transmission and distribution utilities. From documents and drawings to dealing with the utility, revisions, inquiries and the utility's approval.
Grid Connection Application Services
Grid Work handles grid connection applications to Japanese utilities, from document preparation to approval. Power plants, battery storage and data centers, from low voltage to extra-high voltage, with all 10 general transmission and distribution utilities in Japan.
| Target | Low voltage | High voltage | Extra-high voltage |
|---|---|---|---|
| Power plants (solar)POWER PLANT | ✓ | ✓ | ✓ |
| Battery storage (grid-scale BESS)BATTERY STORAGE | ✓ | ✓ | ✓ |
| Data centers (power supply)DATA CENTER | — | ✓ | ✓ |
Low voltage: under 50 kW / High voltage: 50 kW to under 2,000 kW / Extra-high voltage: 2,000 kW and above. Other power plants (wind, biomass, fuel cells) on request.
※ Attached drawings are prepared for the application based on your design documents. Administrative filings such as FIT/FIP project certification are handled with partner administrative scriveners.
What we do (the same for every target)
Documents and drawings
Application forms, single-line diagrams, layout drawings and more, in each utility's required format.
Dealing with the utility
Submission, consultation and progress checks, handled by people who know the utility side of the process.
Revisions and inquiries
We respond to rejections and requests for additional material, resubmit corrected documents, and report progress and deadlines site by site.
Power plants (solar) / Battery storage (grid-scale BESS) / Data centers (power supply)
Power plants (solar)
From low-voltage connection applications to preliminary consultation, connection studies and interconnection agreement applications for high and extra-high voltage.
Battery storage (grid-scale BESS)
From low-voltage battery sites to connection studies and agreement applications for high and extra-high voltage BESS. Multi-site portfolios welcome.
Data center grid connection (power supply)
Site screening, preliminary studies, supply application documents, utility consultation and post-approval deadline management for high and extra-high voltage data centers. We work with overseas developers and investors.
How we work: see here. Consultation and document review only: see here. DX and AI consulting is provided by our group company Virtual Work Inc. (contact form, Japanese).
Start by telling us
how your work flows today.
How to advance grid interconnection applications, or how to automate administrative work. You are welcome to reach out even if you are still gathering information before a formal review.