Practical guidance on grid connection procedures in Japan, based on primary sources from utilities and regulators.

Power Checklist for Data Center Site Selection: What to Confirm About Power Supply Before Signing the Land Contract

This article explains the power-related items to confirm before signing the land contract when selecting a data center site. It compiles the capacity that can be received, the time until power is received, the rough scale of the construction cost contribution, and the deadlines and cancellation rules after the application into a two-stage procedure (published maps, then the preliminary study) and a 12-item checklist.

How to Read the Welcome Zone Map (Available Supply Capacity Map): A Utility-by-Utility List for Data Centers

The Welcome Zone Map (available supply capacity map) is published material showing areas where electricity may be supplied quickly to large-scale demand such as data centers. This article explains the publication status at each general transmission and distribution utility, how to read the maps of TEPCO PG and Kansai Transmission and Distribution, and how to move on to a preliminary study.

When a Data Center Preliminary Study Comes Back with “No Available Supply Capacity” or “Construction Period Over 10 Years”: How to Read the Response and What Options Come Next

How to read a data center preliminary study response that says "no available supply capacity" or gives a long construction period. Within the scope of published materials, this article sets out the standard construction periods for extra-high-voltage work published by TEPCO PG, the relationship with the Welcome Zone Map, and the options after the response, such as revising the receiving capacity, phased power receiving, and replacing the candidate site.

High-Voltage Power Supply for Data Centers: Supply Applications and Indicative Construction Periods for Small and Edge Facilities (Under 2,000 kW)

Small, container-type, and edge data centers with contracted power of 50 kW or more and less than 2,000 kW receive power, in principle, at high voltage (6,000 V). Drawing on primary sources, this article sets out the application flow, the indicative construction periods published by TEPCO PG and Kansai Transmission and Distribution, the practicalities of advancing multiple sites at the same time, and the points to check when using an existing building.

What Is the Supply-Side Preliminary Connection Study? How to Apply for a Data Center Preliminary Study, Response Periods, and Submitting Multiple Candidate Sites Together

The supply-side preliminary connection study (supply-side preliminary study) is an optional procedure for confirming with the general transmission and distribution utility whether construction is required, and of what type, before a demand facility such as a data center receives power. Drawing on primary sources, this article explains how to apply, response periods by area, the items to organize when submitting multiple candidate sites, and how to read the response.

What Is Data Center Application Support? Scope of Work for Power Supply Applications, How to Choose a Provider, and How Fees Work

Data center application support is a service that, on the operator's behalf, prepares and submits documents, responds to queries, and manages deadlines for the preliminary study and the power supply (wheeling supply) application to the utility. Based on published materials, this article explains the scope of work that can be entrusted, how it compares with applying in-house, how to choose a provider, and how fees work.

Data Center Power in Japan: FAQ for Overseas Developers

Applying for data center power in Japan: who to apply to, the steps, timelines, costs, voltage classes, documents, and the October 2026 rule changes. Eleven questions answered.

Japan Data Center Grid Rules from October 2026: Payment Deadline and Cancellation

From October 1, 2026, extra-high-voltage applications in Japan are cancelled if the construction cost contribution is not paid within three months of supply approval. What changed, and how to set your supply start date.

Data Center Grid Connection in Japan: Application Steps Explained

How a data center power supply application to a Japanese utility works: preliminary study, supply approval, construction cost contribution, the documents to prepare, and how it differs from battery storage.

Tell us about your project
and current workflow.

Grid connection procedures, application management, automation. Early-stage inquiries are welcome.