Case Study

Power Producer F: Automating the Preparation of Monthly Reports

DX / AI ConsultingSolar

Before Implementation

Inspection records, electricity sales results, and equipment logs were managed in separate files, and preparing the monthly report involved a large amount of manual transcription. Last-minute corrections just before submission had become the norm, placing a heavy burden on staff. In addition, under FIP operation, the need to prepare supplementary materials explaining market-linked variables had grown, concentrating work at the end of each month.

What We Implemented

We standardized the format of input data and turned the aggregation logic into templates. Report drafts are now generated automatically, and staff perform only the final check. We also turned the review criteria into a check sheet to limit variation in quality. Furthermore, we changed the structure so that only the affected sections are recalculated when a discrepancy arises, shortening the time needed to respond to correction requests.

After Implementation

In addition to shorter report preparation times, the accuracy of pre-submission checks has improved. The end-of-month workload peak has been leveled out, freeing up time for on-site inspections and improvement proposals. Standardizing report preparation has also reduced the training burden when staff change, resulting in an operation that is easier to sustain over the long term.

All Case Studies