SERVICE

Grid Connection Application Services

We handle grid connection applications to Japanese utilities for power plants, battery storage and data centers. Low voltage to extra-high voltage, all 10 general transmission and distribution utilities. From documents and drawings to dealing with the utility, revisions, inquiries and the utility's approval.

(01) — Scope

Grid Connection Application Services

Grid Work handles grid connection applications to Japanese utilities, from document preparation to approval. Power plants, battery storage and data centers, from low voltage to extra-high voltage, with all 10 general transmission and distribution utilities in Japan.

TargetLow voltageHigh voltageExtra-high voltage
Power plants (solar)POWER PLANT✓✓✓
Battery storage (grid-scale BESS)BATTERY STORAGE✓✓✓
Data centers (power supply)DATA CENTER—✓✓

Low voltage: under 50 kW / High voltage: 50 kW to under 2,000 kW / Extra-high voltage: 2,000 kW and above. Other power plants (wind, biomass, fuel cells) on request.
※ Attached drawings are prepared for the application based on your design documents. Administrative filings such as FIT/FIP project certification are handled with partner administrative scriveners.

(02) — What we do

What we do (the same for every target)

01

Documents and drawings

Application forms, single-line diagrams, layout drawings and more, in each utility's required format.

02

Dealing with the utility

Submission, consultation and progress checks, handled by people who know the utility side of the process.

03

Revisions and inquiries

We respond to rejections and requests for additional material, resubmit corrected documents, and report progress and deadlines site by site.

Start by telling us
how your work flows today.

How to advance grid interconnection applications, or how to automate administrative work. You are welcome to reach out even if you are still gathering information before a formal review.

Contact Us