Background
As the number of projects grew, each staff member was preparing application documents in a different way, and documents were frequently sent back during review. In particular, the differences in required attachments between utilities were hard to grasp, making the work difficult to reproduce. Given that the response period for a connection study is, as a rule, three months, any delay in the initial preparation translated directly into a delay in the overall schedule.
Our Approach
We took inventory of the submission requirements for each utility and consolidated the input ledger, attachment checklist, and submission history into a single set. We automated a pre-check so that any missing information becomes visible during the document preparation phase, before submission. We also introduced version control for the revision history of single-line diagrams, layout drawings, equipment specifications, and similar documents, and established operating rules to ensure that only the latest files are in circulation.
Results
Lead time from document preparation to submission was shortened, and handovers between staff became easier even when projects run in parallel. Time previously spent dealing with returned documents can now be devoted to interpreting study results and preparing for the next stage. As a result, the client can now reprioritize projects and bring forward preparations for contract applications, which has also improved the reliability of its business planning.