Challenge
Field staff each prepared application forms in a different order and with different checkpoints, and the rate of documents being sent back at approval remained stubbornly high. In months when projects overlapped, delays in submission became evident. The information needed to decide whether to proceed to a contract application after the connection study was scattered, making the lead time for internal approval hard to predict.
Our Approach
We broke the document preparation process into three stages—"Gathering Required Information," "Drafting," and "Cross-Checking"—and clarified the owner and completion criteria for each stage. We introduced a checklist that makes omissions in each stage visible. We also turned the items most frequently sent back in pre-submission review into a knowledge base and incorporated them into the standard templates so that the same issues do not recur in the next project.
Results
The client moved to a structure in which submissions maintain the same quality even when staff change. Resubmissions occur less frequently, and the planning accuracy of connection study applications has improved. As a result, workload estimates at project kickoff have stabilized, and the submission schedule can now be maintained even during busy periods.